>
Course Unit Title | Course Unit Code | Type of Course Unit | Level of Course Unit | Year of Study | Semester | ECTS Credits |
---|---|---|---|---|---|---|
Electric and Electronic Practices | UEE308 | Compulsory | Bachelor's degree | 3 | Spring | 3 |
Associate Prof. Dr. Mehlika ŞENGÜL KARAARSLAN
Assistant Prof. Dr. Nasır ÇORUH
Lecturer Onur SATI
1) Describe avionic test equipment and use it
2) Explain Engineering Drawings
3) Explain EWIS systems
4) Explain bonding techniques and be able to bonding
5) Students be able to use connector pin removal and insertion
6) Explain Abnormal Events and preventation
Program Competencies | |||||||||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | ||
Learning Outcomes | |||||||||||||||||||
1 | Middle | Middle | Middle | High | High | High | High | Middle | High | High | High | Middle | Middle | Middle | High | High | High | Middle | |
2 | High | High | High | Middle | Middle | Middle | High | High | High | Middle | Middle | Middle | High | High | High | Middle | Middle | Middle | |
3 | High | High | Middle | Middle | Middle | High | High | High | Middle | Middle | Middle | High | High | High | Middle | Middle | Middle | High | |
4 | High | High | High | Middle | Middle | Middle | High | High | Middle | Middle | Middle | High | High | High | Middle | Middle | High | High | |
5 | High | Middle | Middle | High | High | High | High | Middle | Middle | Middle | High | High | High | Middle | Middle | High | High | High | |
6 | High | High | High | Middle | Middle | High | Middle | Middle | Middle | Middle | Middle | High | Middle | Low | Low | Middle | Middle | High |
Face to Face
None
Not Required
Tools: Operation, function and use of electrical general test equipment; Avionic General Test Equipment: Operation, function and use of avionic general test equipment; Engineering Drawings, Diagrams and Standards: Wiring diagrams and schematic diagrams; Electrical Wiring Interconnection System (EWIS); Continuity, insulation and bonding techniques and testing; Use of crimp tools: hand and hydraulic operated; Testing of crimp joints; Connector pin removal and insertion; Co-axial cables: testing and installation precautions; Identification of wire types, their inspection criteria and damage tolerance. Wiring protection techniques: Cable looming and loom support, cable clamps, protective sleeving techniques including heat shrink wrapping, shielding; EWIS installations, inspection, repair, maintenance and cleanliness standards. Welding, Brazing, Soldering and Bonding; Soldering methods; inspection of soldered joints. Electrical ground supplies. Abnormal Events: Inspections following lightning strikes and HIRF penetration;
Contribution of Practices to Course Grade |
60% |
---|---|
Contribution of Final Examination to Course Grade |
40% |
Total |
100% |
Turkish
Not Required